Tracking Projects

The Grove System

Use a d6 to track projects in length of required loopsto complete, such as building a facility or planning an event. Reduce the tracking die during each Update Phase by 1. Once the die rolls over from 1, the project is complete.
Miscellaneous Contact
Deploys by Netlify This site is powered by Netlify